National Oil Company concludes one year pilot

Staatsolie:  Tambaredjo and Calcutta Fields
 “We initiated a one year pilot in two remote areas of Suriname using the Smart Pumper™ Automation with the Direct DriveHead for PCP pumping.  We were pleased to see that as soon as the wells were activated we had a virtual control room in our field office without the cost of SCADA.   We were also pleased to experience and report that after a year, all of the wells are still pumping perfectly achieving and maintaining the fluid levels we select.  There have been no pump failures either.  After asking for and receiving specialized firmware features from the Smart Pumper™ team that enables us to conduct 24-48 hour pressure build-up tests remotely, we have recommended it be deployed company-wide.”  -  Elred Anthony, Production Engineer